Wednesday, January 12, 2011

Rochester Disassembly, Part 5

With the valve apart it’s time to make some changes.

01121101

The internal valve body threads are 27 tpi, as best I can figure. I was hoping I’d have a tap to clean the threads out but it was an odd diameter…

01121102

So I used a pipe tap as a scraping tool, following the wall around to clean off all the schmutz.

01121103

The plug was cleaned up with a thread file.

01121104

Now it screws together easily.

01121105

Whatever the old seal is, it has to go.

01121106

I made an arbor to hold the plug on the lathe. A rubber washer protects the inlet valve seat.

01121107

Parting tool set up to make an o-ring groove.

01121108

Turning the groove.

01121109

Test fitting an o-ring

01121110

Doesn’t screw quite all the way on, but that will be addressed…

01121111

Cleaned up the face of the plug while I was at it.

01121112

Like new!

01121113

I needed to bore a recess for the o-ring in the valve body.

01121114

Just enough to get down to the thread root.

01121115

Seems to go together snugly.

01121116

The solder filled a groove at the end of the threads on the valve body. I turned away the solder until I just hit the brass.

01121117

Test fitting it to the tube. Aligned, the gap is too large, but I suspected the threads in the tube needed more cleaning.

01121118

You can see that the slot and the setscrew hole need to be aligned.

01121119

After cleaning out the tube threads a bit more the gap is acceptable and similar to the assembled versions…

01121120

I also made two seals for the inlet and exhaust valves. They may be too thick (.125”) although the old ones are so deformed it’s hard to tell how proud they should be. I’ll try them like this and modify as necessary.

Next up is the pump plunger, then figuring out how to keep the tube aligned and sealed to the valve body without resorting to solder. Then reassembly…

No comments:

Post a Comment