I know the project so far has been somewhat vague, but this part brings the whole project together...almost.
Drilling a hole the OD of the tube.
Deburring.
Parting off.
Flip and debur.
I didn't even put in a picture of an edge finder...drilling a #8 clearance hole.
Making a flat spot.
Milling one side.
Milling the other.
Sawing one side.
And the part comes free.
The clamping shoe. Those two screws are #8 button heads turned down to be a sliding fit in the slot.
The project is 75% completed. I now have a sliding stock, lockable and adjustable for length. Just the butt remains...
awesome!!!
ReplyDeletewhere is the sign up list?