Saturday, August 13, 2011
Tech Force TF79 / AR2078A Upgrades--Part 4
Just a quick check in post. I'm still making component pieces before starting all the shaping. On to the hook!
Found center of a piece of 1/2" round aluminum rod. This will attach the hook to the main rod.
Spotted
Through drilled 3/8" at an angle--to fit over the rod.
Cut a slit for a pinch clamp.
Faced the ends and added a bevel.
Drilled, tapped, countersunk for the M5 pinch bolt.
Test fit. The leftmost piece is the attachment piece for the shoulder hook.
Now for the hook itself: Faced a piece of 7/16" W-1 steel. (it's a water-hardening tool steel)
A second piece gets a slight taper and some decorative grooves.
Milled halfway through each end to create flats. Getting the flats parallel to each other took some set up time.
Another view of the milling cutter.
A little layout, then the holes were spotted and drilled.
These will be the pivot points to allow adjustment of the hook.
Tapped M5 x 0.8mm.
Still in the rough, but there's the hook.
Beveled the ends with a belt sander so it doesn't look gnawed by rats. If I later find that more adjustment possibilities are required, it'll be simple to cut and add an additional pivot(s).
Again, a rough test fit. The aluminum blocks are gonna need a lot of work.
The rubber pad will be removed from the stock and all this (and more) will be retrofit.
Cleaned up the hook on a brass wire wheel. At least the hook is ready for prime time. I guess I need to finish the top of the buttplate then get on with the shaping. Oh, and there's the base plate to connect this to the stock.
So, there's more to come.
Tuesday, August 9, 2011
Tech Force TF79 / AR2078A Upgrades--Part 3
The wretched adjustable buttplate project continues...
Reamed the 3/8" through hole for the rod.
Too much flash. Still, you can see that the heads of the M6 bolts are recessed to clear the 3/8 mounting rod.
like so
Block assembled. It's vertically adjustable on the rod. I'll eventually add a flat on the rod for the setscrews to bear against.
Moving on to the shoulder blocks. These will be individually adjustable on the 3/8" rod.
Rough cut.
Trued up the ends in the 4-jaw chuck.
A facing cut on each end gave 90 degree edges.
And another...
No daylight on the edges. Good enough for me.
Still need another block for the bottom, a top piece and a shoulder hook, a base plate... This is gonna take some time.
Layout for the 3/8" mounting hole as well as pinch clamp bolts.
And the adapter needs a threaded hole for it's shoulder block.
Tapped M5 x 0.8mm.
Spotted and through drilled for clearance for the M5 mounting bolt.
Countersunk and screwed to the block.
Each lower plate was through drilled for the 3/8" rod,
Then drilled for an M5 pinch bolt.
Counterbored for the heads of the fasteners.
Roughly sawed a slot--I'll open and even all these up with a slitting saw. Tapped the M5 threads.
Lower plates attached to the rod.
It's barely starting to look like something. I'll probably make the hook next then move on to the top.
More soon.